Where to start.....This has been a project several years in the making but its time to pass it on...The chassis was largely completed and body remounted to frame to begin metal work.
As you can see, the bronco was completely disassembled down to the frame. Frame was sandblasted and POR-15'd. Work performed to date includes:
New Toms Bronco 2.5 inch lift/shocks
Body lift kit
Front Brake Disc Conversion
All around stainless steel brake lines
New Locking Hubs
New Power Steering
New Master Cylinder (not installed yet)
complete engine rebuild
Edelbrock manifold
Steering Stabilizer
Rebuilt Trans
Rebuilt Transfer Case
New Drive shafts
Distributor, water pump, fuel pump
As far as the body is concerned....The body work was begun. Not bad rust at all. Front passenger floor panel replaced. Driver side replacement panel is included but must be installed. Many parts not shown in pics are included....i.e. speedo cluster, all pedals,
NOTE: The engine has not been run since rebuild. Has been kept lubricated and crank spun.
Please ask questions!!! I spent a small fortune getting it to this point and would love to see it finished.