Classiccarsexport.com

1969 Toyota Land Cruiser FJ40 Resto-Mod

  • Price: Ask a price!
  • Condition: Used
  • Make: Toyota
  • Model: Land Cruiser
  • Year: 1969
  • Mileage: 102,369
  • VIN: FJ4058194
  • Color: Aluminum & Black
  • Engine size: Chevy 350
  • Number of cylinders: 8
  • Fuel: Gasoline
  • Transmission: Automatic
  • Drive type: 4WD
  • Drive side: Left-hand drive
  • Vehicle Title: Clear
  • Location: Aliso Viejo, California, United States

Description

Frame up resto-mod. I finished it 2 years ago. Everything has been rebuilt or replaced and upgraded. The list is long so if you're serious, I'll send you a build sheet. Dolores has been featured in shows and magazine including Jay Leno's Garage. There are ~$50k in parts and 1700+ labor hours in this rig. I'm selling because it's time for the next project. I built her for use, so there are approximately 10,000 miles (mostly on road) on her since I finished the build. She turns heads everywhere she goes because of how she looks and sounds. She rides very smooth at freeway speeds and tracks straight. Please let me know if you have anymore questions. (I will take the time to orient the buyer to everything she has so that I know she'll be in good hands.)
I took the list below from the build album on facebook. You can view pictures of Dolores' compete build there as well... You might have to copy and paste this link: https://www.facebook.com/media/set/?set=a.2794252090948.2146337.1097802468&type=1&l=2f48984923
Long list of things done on Dolores the FJ40....DONE
1) Vehicle is gutted now and ready to remove the body. -DONE
2) Next remove body and bodylift.- DONE
3) Reposition entire drivetrain - DONE.
4) Rewire with Painless Performance Products. engine & chassis harness - DONE
4a) Wired in 2000 watt inverter
5) Install new gauge cluster. (Provided by Dakota Digital) - DONE
6) Install new radiator and electric fan (Provided by Advance Adapters) - DONE
7) Install and plumb heater...maybe combined heater/ac unit (Nostalgic Air) - DONE
8) Install new steering column (Ididit) and connect steering linkage - DONE
9) Install 4x4 Labs crossover highsteer w/6 bolt arms/knuckles - DONE
10) Finish setting up front suspension w/custom Alcan springs (spring over) - (shackle, bushings, hardware provided by Red Line Land Cruisers) - DONE
11) Set up rear suspension w/custom Alcan springs (spring over) - longer spring & centered pin so axle rearward 6 inches - wheel base lengthened to 95" (shackle, bushings, and hardware provided by Redline Land Cruisers) - DONE
12 )New drivelines. (Provided by J. E. Reel Driveline Specialists) - DONE
13) Plumb brakes - new tubing and connections (incl. Classic Performance Parts proportioning valve) - DONE
14) Plumb rear ARB and replumb front ARB - DONE
15) Install and plumb compressor and new air tank. (Provided by ARB 4x4 Accessories - USA Office - DONE
16) Install and plumb rear JAZ Products 22 gal. fuel cell. (Tank Provided by Jaz Products/Modified by Aerotech Services Inc to install fuel collector) - DONE
16a) Cut hole for fuel cell in body pan - (discarded stock tank) DONE
17) Install new cage - (Provided by Red Line Land Cruisers) - DONE
18 ) Install new front Rally Venture heated seats (Provided by PRP Seats)
19 ) Install new 4x4Labs rear bumper/swing tire carrier. - DONE
20 ) Install Warn 8274 winch mount and winch (upgraded to 9.5XP winch motor). - DONE
21 ) Install front bumper - Rubicon Series(Provided by HANSON OFFROAD) - DONE
22) Install 4.3:1 Atlas - 2 speed Transfer case (Provided by Advance Adapters)- DONE
23 )MSD ignition products (Provided by MSD Performance) - DONE
24) Install new fan/fan clutch - DONE
25) Install new tranny cooler - DONE
26) New power steering cooler - DONE
27) Install new body bushings - (provided by Energy Suspension)-DONE
28) Install new engine mounts -(provided by Advance Adapters)- DONE
29) Install new trans/tcase crossmember (provided by Advance Adapters)- DONE
30) Install axle wrap bar - (Provided by RuffStuff Specialties) -
31) Install frame box in plates - (Kit provided by RuffStuff Specialties) - DONE
32) New aluminum tub/cowl/windshield frame/half doors/tailgate from Aqualu Industries Inc. - DONE
33) Install 4.88 rings and pinions. (Provided by Yukon Gear & Axle) - DONE
34) Rebuild front axle with Trail-Gear knuckle sandwich kit. - DONE
35) Shock positioning and mounts - DONE
36) Bilstein Shock Absorbers 7100 series install - DONE
37) Install driving lights, signals, side view mirrors, hood hinges, hood latches, windshield hold downs, and windshield bumpers (Provided by Cruiser Outfitters) - DONE
38) Install new brake master cylinder - DONE
39) Refinish/paint frame, axles, and body - DONE
40) Mount TR Beadlock Wheels on BFGoodrich Tires - DONE
41) Fabricate and install Energy Suspension Bumpstops -
42) Fabricate steering crossbar support - DONE
43) Install Flex and Cyclone auxiliary lights by KC HiLiTES, Inc. - DONE
44) Y-pipe, exhaust and muffler by Ed Hanson - DONE
45) Custom battery tray - modified single battery RuffStuff trays - DONE
Post
46) Weld and intstall rock sliders by Red Line Landcruisers - DONE by Moab 4X4 Outpost
47) Fabricate/install bump stops - DONE by Moab 4x4 Outpost
48) Fabricate/Install cage-frame tie-in by Red Line Landcrusiers - DONE..thanks Moab 4X4 Outpost - Steve Nantz
I'll post updates as more work gets done.....
4/20/15
Details to get fixed/finished:
Brake fluid reservoir leaks (yes, it was new) Remove and install second new one. - DONE
Finish installing buttons for soft top rear panel. -DONE
Balance tires/align front end. - DONE
Install license plate holder with 3rd brake light (Gen-right). - DONE
6/15/15
Lost 3rd gear...we will drop transmission for rebuilding by Poway Transmission - DONE
2016 - Grant Steering Vehicle Security system. - DONE
2017 - New alternator - DONE
Jay Leno's Garage premier - DONE