The vehicle was taken down to the frame. New bracing was installed under the tub and a new floor pan on the passenger side. The underside & interior .of the tub was sealed with Lizard lining. The motor has been rebuilt, front end: king pins, bushings, seals, bearings and brakes. The rear axle-new ring & pinion gear, seals, bearings, brakes, a new master cylinder and all new brake lines. The carburetor has been rebuilt, new fuel pump & fuel line, new radiator, all new wiring, steering has been rebuilt, new speedometer (I still have the original) and new exhaust. I also have a spare tire (matching) that goes with the jeep. The jeep does have a factory/dealer installed heater under the dash on the passenger side. I would like to add that I have a box of parts that go with the vehicle-wipers, extra miscellaneous bolts, gaskets and hardware.